Reviews

 

Radiosurgery, Radiation Treatment and General Oncology Center of DTC IIBS

«According to the design electric power supply of the main equipment is fulfilled using busbars. Rated current on the line is 2,250 А.

Power take-off devices with circuit breakers are provided for along the length of the route. In the course of the bidding on supply of this equipment Russian Busbar Center was chosen as the bidder with the best supply offer.

During the design fulfilment the company's specialists performed dimensional survey of the building's construction part, prepared technical documentation for obtaining approval and the order's launch into manufacture. Also parts for connecting busbars to switchboard equipment were developed and supplied. In the process of the design fulfilment a need to modify the busbars' route in situ arose due to correction of the switchboard equipment position.

This task was timely solved by the Russian Busbar Center specialists who changed arrangement of the existing route and additionally supplied the required busbar sections.

The equipment assembly was performed under control of the company's supervision engineer. Under his guidance the busbar was assembled at top quality and in compliance with all the manufacturing plant's requirements in the shortest time possible.

We can recommend Russian Busbar Center being part of Moselectro Group of Companies as a reliable partner.»

General Director of Radiosurgery, Radiation Treatment and General Oncology Center of DTC IIBS, LLC
O.V. Lipisvitskiy

Technology Group H.E

«We hereby inform you that after the bidding procedures held in 2015 OJSC MOSELECTRO supplied TENE-20-12500-400 UKhL1 air insulation busducts manufactured by it to the power plant of the town of Aksu for JSC Eurasian Energy Corporation (EEC).

The supply was fulfilled according to the Technical Assignment and the Supply Contract terms. The plant's specialists rendered full support and offered consultations at the stage of assembly, commissioning and start-up of the equipment. As of today no failures of the installed equipment have been registered.

We hope for further cooperation between our companies in the future.»

Director
Timothy Loh Teck Keong

Joint Stock Company Russian Aircraft Corporation "MiG"

«Over the period of our cooperation OJSC Moselectro proved to be a highly professional company with competent staff who provides timely and quality solutions for the set tasks.

The company timely supplied quality switchgear and busbar according to the Technical Assignment and the Supply Contract terms, and in compliance with the current rules and regulations. All our requests were treated to the maximum respect during the course of the supply.»

Chief Power Engineer of PC No.1
V.A. Shevlyakov

BFT LLC (Budget Financial Technologies): production and sales of construction materials made of autoclaved aerated concrete, DRAUBER.

«BFT LLC is happy to recommend RBC-Metabar bus ducts as equipment convenient in assembly and installation, and reliable and cost effective in operation. It is a great option for electric power transmission and distribution in the conditions of heavy loads in an enterprise’s power networks.»

Chief Power Engineer
V.N. Tarasov

Kazakhmys – Ekibastuz GRES-1

«Despite the tight deadlines, the entire order was supplied on time.

The well-coordinated work of all services allowed us to discover all errors made at the design stage and eliminate them within the shortest period of time. During the equipment installation, adjustment and commissioning operations the plant's specialists provided extensive support and consulting services for the installation organisation.»

Deputy Chief Engineer
K.B. Omarbekov

Kuzbassenergo OJSC – Novokemerovskaya CHP

«Up to now, the busbar routes and factory-assembled switchgears have been installed and the insulation dielectric properties have been tested. We have no claims with regard to the package completeness and quality of the supplied equipment. The plant's maintenance support has been provided in full at the product acceptance and installation stages.».

Station Master
S.V. Pushkin

ENEX Open Joint Stock Company

«ENEX Company would like to hereby express its gratitude for successful and timely supply of generator voltage isolated phase bus ducts of IPB (TENE) type manufactured by OJSC MOSELECTRO within the framework of fulfilment of international project "Construction of TPP Termogas Machala TPP (The Republic of Ecuador)".

An isolated phase bus duct of IPB type is designed for operation as part of 6РА gas turbine plants (GTP) for CCGT of Termogas Machala TPP.

ELECTRIC POWER CORPORATION OF ECUADOR (CELEC E.P.) acts as the project's General Customer, and INTER RAO-EXPORT, LLC acts as the Customer.

Over the whole period of cooperation which started in 2014 your company's employees have been proving high professional and interpersonal skills during our work.

ENEX Company would like to particularly show its appreciation of considerate approach to the set tasks as well as their timely and prompt resolving.

We would also like to say personal thanks to Sales Director Mr. Aleksey V. Farmakovskiy, Project Supervisor Mr. Pavel A. Butrov and generally to the whole team of the engineering department, involved in this international project fulfilment, for their professional skills and ability to solve the arising issues in the shortest time possible.

It is worth noting that this project is an international event, and that the team of OJSC MOSELECTRO's professionals has made a significant contribution to its fulfilment.

OJSC MOSELECTRO has proved to be a reliable manufacturer shipping its equipment in full scope and in compliance with the requirements of the International Electrotechnical Commission (IEC) and standards within the contract stipulated deadlines.»

Vice President for Generation at ENEX
V.V. Kim

Inter RAO – Sangtudinskaya HPS-1 OJSC

«The Customer closely cooperated with the Supplier at the equipment installation, adjustment and commissioning stage: received hotline consulting services and electronic versions of the required technical documentation, diagrams, drawings, instructions. The Supplier’s actions were well coordinated, meaningful and prompt, which undoubtedly facilitated the upcoming of the successful and highly significant event for the two countries—Russia and Tajikistan—commissioning of the first hydroelectric generating set of Sangtudinskaya HPS-1.

During the operation the busbars and the factory-assembled switchgear K-104M proved to be highly reliable equipment requiring no complex operation; no operational failures or faults have been registered so far.».

Deputy Director General
N.F. Goziyev

Karaganda BI Energy Plus LLP

«The plant's specialists provided us with full-fledged support and consulting services at the equipment installation, adjustment and commissioning stage. No operational failures or faults of the equipment have been registered as of today.

Karaganda BI Energy Plus would like to express hope for further cooperation and is happy to recommend Moselectroshield OJSC as a reliable, highly qualified and efficient manufacturer and responsible partner.»

Director
N.T. Abdraimov

MRSK VOLGI, Interregional Distribution Grid Company Joint-Stock Company—Ulyanovsk Distribution Grids—Substation Tsentralnaya

«The specified products were supplied within the agreed timelines. During assembly, installation and adjustment operations the plant's specialists provided prompt solutions for all issues the installation organisation had come across. As of today, installation of busbar routes has been fully completed.

The branch of Interregional Distribution Grid Company Joint-Stock Company—Ulyanovsk Distribution Grids (MRSK Volgi JSC) has no claims concerning the package completeness and quality of the supplied equipment.

Deputy Capital Construction Director
A.V. Kochetov
 
 
 
 